Duplicate entry
The same information is re-entered, copied or reconciled across multiple tools.
Enter volumes and costs in one currency. The calculator applies fixed assumptions to explore an indicative range, without promising gains or calculating net return.
When schedules, rounds, reports, inspections, training and employee records live in separate systems, cost shifts into manual work, verification and rework.
The same information is re-entered, copied or reconciled across multiple tools.
Managers spend time consolidating, checking and following up instead of managing operations.
Multiple subscriptions may cover functions that would benefit from sharing the same context.
Missing data or an unmanaged deadline can create rework, delays and compliance exposure.
Replace sample values with non-confidential figures. Results add several gross value drivers without deducting MeridCore™ subscription, implementation, integration, devices, training or change support.
You change volumes and costs, not the coefficients. The rates below are fixed simulation assumptions, not measured client outcomes or guaranteed gains.
Weekly hours × 52 × loaded hourly cost × 20%.
Monthly hours × 12 × loaded hourly cost × 12%. No separate overtime premium is applied.
Monthly reports × 12 × (minutes per report ÷ 60) × loaded hourly cost × 18%.
Current monthly software costs × 12 × 20%. Which subscriptions can actually be replaced must be verified.
Annual billable revenue × 0.25% + entered annual losses, credits or disputes × 15%. These assumptions must be validated without overlap.
The five components sum to the central scenario, labelled “Likely”. “Conservative” is 60% of that sum; “Optimized” is 155%. These labels do not represent statistical probabilities. The breakdown below the cards corresponds to the central scenario.
Report-writing hours already included in administrative time or overtime can inflate the total. Revenue and losses may also overlap; the calculator does not detect these overlaps.
Recoverable time can create capacity without cash savings. A net assessment must deduct full project costs and account for the pace of adoption.
Industry, headcounts, sites and manager counts provide context; they do not change the coefficients. Currency changes formatting without foreign-exchange conversion.
Separate achievable benefits, project costs and figures still requiring validation in a personalized assessment.
Request an assessment